Gateproof

Gateway 2 checklist

Everything a building control approval application for a higher-risk building in England must contain: 64 items from regulations 4, 5 and 12 and Schedule 1 of the Building (Higher-Risk Buildings Procedures) (England) Regulations 2023 (SI 2023/909), plus the BSR's guidance on preparing applications.

Check your pack against this list automatically → Free, runs in your browser, nothing uploaded.

Under regulation 5(3), an application is valid if it complies with regulation 4 (regulation 13(3) and regulation 12 for work to existing higher-risk buildings). The BSR says many applications fail validation on basic missing information, so it's worth ticking through this list before submitting.

Documents that must be included (13)

Information the application must give (17)

What the documents must contain (34)

Sources

Compiled from the regulations and guidance as published at the time of writing. Check the current versions on legislation.gov.uk and GOV.UK. This is a screening aid, not legal or compliance advice.